Share Langdale Well Field on FacebookShare Langdale Well Field on TwitterShare Langdale Well Field on LinkedinEmail Langdale Well Field link
The Langdale Well Field Project is an SCRD water supply project that will support residents and commercial water users on the Langdale Water System, and potentially the Chapman Water System.
Why Langdale?
The SCRD operates a groundwater well in Electoral Area F (West Howe Sound), near the Langdale Ferry Terminal which services the Langdale area. In 2017, groundwater studies identified the potential to draw more groundwater from this aquifer source sustainably.
The Langdale Water Systemhas the potential to be connected to the Chapman Water System. This will help increase water supply for residents on the Chapman Water System and provide redundancy to Langdale water customers.
What's Next?
In 2022, the SCRD drilled two new production-sized wells to confirm that this site is suitable for expansion and that the source meets water quality requirements. The results from the wells have been favourable.
Preliminary engineering and design report was presented to the SCRD's Committe of the Whole on January 11, 2024. The report can be found on the right panel of this page.
The SCRD submitted the applications for the groundwater licence and Crown Land Tenure from the province in January 2024 and the project notification submission to the Environmental Assessment Office was accepted on July 25, 2024. The SCRD is actively engaging with the Sḵwx̱wú7mesh Úxwumixw (Squamish Nation) and received approval to use the traditional language name, Ch́’ḵw’elhp Well Field for the project.
Hit the subscribe button in the right sidebar to join our mailing list for this project.
The Langdale Well Field Project is an SCRD water supply project that will support residents and commercial water users on the Langdale Water System, and potentially the Chapman Water System.
Why Langdale?
The SCRD operates a groundwater well in Electoral Area F (West Howe Sound), near the Langdale Ferry Terminal which services the Langdale area. In 2017, groundwater studies identified the potential to draw more groundwater from this aquifer source sustainably.
The Langdale Water Systemhas the potential to be connected to the Chapman Water System. This will help increase water supply for residents on the Chapman Water System and provide redundancy to Langdale water customers.
What's Next?
In 2022, the SCRD drilled two new production-sized wells to confirm that this site is suitable for expansion and that the source meets water quality requirements. The results from the wells have been favourable.
Preliminary engineering and design report was presented to the SCRD's Committe of the Whole on January 11, 2024. The report can be found on the right panel of this page.
The SCRD submitted the applications for the groundwater licence and Crown Land Tenure from the province in January 2024 and the project notification submission to the Environmental Assessment Office was accepted on July 25, 2024. The SCRD is actively engaging with the Sḵwx̱wú7mesh Úxwumixw (Squamish Nation) and received approval to use the traditional language name, Ch́’ḵw’elhp Well Field for the project.
Hit the subscribe button in the right sidebar to join our mailing list for this project.
Share Well Drilling Project Photos on FacebookShare Well Drilling Project Photos on TwitterShare Well Drilling Project Photos on LinkedinEmail Well Drilling Project Photos link
Setup for drilling Well
Drilling of Well
Discharging water successfully from completed Well,
Sanitary sealing of Well
Page last updated: 31 Jul 2024, 03:59 PM
Follow Project
Stay informed
Subscribe for project updates
Project Timeline
Project Initiated
Langdale Well Field has finished this stage
April 2021
Consultation with Sḵwx̱wú7mesh Úxwumixw about potential project impacts
Langdale Well Field has finished this stage
Initiated in 2021, and ongoing
Well development: Designing, drilling, testing, and analyzing two production sized wells.
Langdale Well Field has finished this stage
2022
Apply for Water Licence from Province
Langdale Well Field has finished this stage
January 2024
Results of well tests, engineering design, and project costs presented to Board of Directors
Langdale Well Field has finished this stage
January 2024
Engineering design of proposed well field, water treatment, and water main connections begins. Water license application.